Terms & Conditions
- General
These Terms apply to all hardware and software purchases made via the PROJECT O.A.S.I.S. Store (https://projectoasis.net). By placing an order, you agree to these conditions. - Pricing & Taxes
All store prices are listed in USD (US Dollars) or PLN (Polish Złoty) depending of your location.
- US and International Retail Orders (B2C): Orders shipped outside the European Union are processed with 0% EU VAT. International buyers are responsible for any local import duties or customs clearance fees applicable in their destination country.
- European Union B2B Orders: For EU business customers, applicable local VAT (e.g., 23% for Poland) or tax exemptions are calculated dynamically at checkout based on location and tax credentials.
- Orders & Payment
Order acceptance is subject to inventory availability and payment authorization. We accept payments via supported online payment gateways (credit cards, Apple/Google Pay). - Production & Processing Time
Each unit or kit ordered from Project O.A.S.I.S. is custom-built, assembled, or configured on demand to guarantee maximum hardware reliability and precision.
Please take note of the following lead times prior to order confirmation:
– O.A.S.I.S. Turnkey Station & Turnkey Station PRO: 3-4 weeks (or less)
Includes full computer sourcing, custom CAD insert fitting, component wiring, optional EMP shielding integration, system flashing, and multi-stage field stress testing
– Hardware Integration Kit DIY: 7 days (with EMP Protection 7-14 days)
Includes precision technical polymer panel production, structural frame assembly, internal cable routing setup, and quality verification prior to dispatch.
– Blackbox: 7-14 days
– OASIS SCOUT: 7-14 days (or less)
Note: All processing times represent dedicated bench work prior to carrier handover and do not include international shipping transit times. - Liability & Compliance
PROJECT O.A.S.I.S. is not liable for improper technical usage, unauthorized modifications, or deployment of tactical systems outside intended operational parameters. Buyers are responsible for ensuring compliance with local laws regarding the acquisition and use of specialized technical hardware. - Governing Law
Transactions are regulated under applicable commercial standards and consumer protection frameworks.